The following is a listing of major projects completed over the years. Smaller projects, not listed here, greatly outnumber the larger ones. We are a service oriented business and value small projects.
Abaxis (Bio-Medical) $6,500,000
Hayward, Ca
Fast-track phased construction of 60,000 SF of offices, 40,000 SF of lab space, including 16,000 SF of dry rooms (5% RH), and a new mezzanine to support air-handling equipment and dryers. The project also included a new equipment pad, warehouse, and support areas.
AMD K-6 Development Lab (Clean Rooms/Hazardous Occupancies) $1,275,000
Sunnyvale, Ca
Design-build construction of a new lab for the development of the K-6 chip.
Applied Materials (Clean Rooms/Hazardous Occupancies) $2,300,000
Santa Clara, Ca
Toxic Gas Ordinance retrofit and installation of 13 tools.
Avocet Medical, Inc. (Medical) $900,000
San Jose, Ca
Construction of offices, labs, and dry rooms including 2,000 SF at 5% RH and 1,500 SF lab maintained at 10% RH.
Axon Photonics (Clean Room/Hazardous Occupancies) $1,175,000
Fremont, Ca
Design-build clean room expansion totaling 2,000 SF of Class 100. Project included new DI system, scrubber, CDA, and chiller.
Axon Instruments (Medical) $2,850,000
Hayward, Ca
100,000 SF of lab and semi-clean areas for assembly.
Bay Area Labels (Clean Room/Hazardous Occupancies) $350,000
San Jose, Ca
Design-build 2,300 SF of Class 100 clean room including equipment platform and facilities support areas. Designed and built in 10 weeks.
Blue Pumpkin Software (Tenant Improvement) $473,000
Sunnyvale, Ca
Renovation of 34,000 SF offices. Designed, permitted, and built in 45 days.
Bonny Doon Vineyards (Retail) $175,000
Santa Cruz, Ca
New 7,500 SF offices, wine tasting and reception areas.
Centaur Pharmaceutical (Animal Facility/Medical) $4,250,000
Santa Clara, Ca
Design-build GMP research facility. 12,000 SF offices, 17,000 SF animal facility, 6,000 SF of surgical, histology and chemistry labs. Project included redundant air handling and support equipment (water systems, autoclave, etc.), emergency generator, and exhaust systems.
Chinese-American Mutual Assistance Association (Structures/Tenant Improvements) $4,400,000
San Jose, Ca
22,000 SF office building. Design-build from general plan to conceptual to final working drawings. Included 30 car underground parking, interior improvements, and Temple.
Coalescent Surgical (Bio-medical) $200,000
Sunnyvale, Ca
Expanded production and assembly area by 6,000 SF including new Tissue lab. Total of 8 weeks from design through final inspection.
College Track (Retail) $250,000
Palo Alto, Ca
New 2,500 SF of classrooms and offices for non-profit organization.
Cybeq NanoTech (Clean Room/Hazardous Occupancy) $2,300,000
San Jose, Ca
Design-build Class 10, 100, and 1000 clean rooms totaling 5,000 SF. There was 10,000 SF of tool manufacturing area. Included mechanical pad, DI water, and AWN systems.
DiaDexus (Bio-Medical) $475,000
Santa Clara, Ca
11,000 SF of R & D labs, including new hoods and casework.
e-Voice (Tenant Improvement) $750,000
Menlo Park, Ca
Conversion of 14,000 SF of barrel vaulted warehouse into “Tech” interior for executive offices and training areas.
Foundry Networks $1,900,000
San Jose, Ca
Build-out of 70,000 SF of shell. Included new FM200 fire suppression system and extensive power distribution. Completed in 10 weeks.
Franklin Resources, Inc. (Tenant Improvement) $2,100,000
San Mateo, Ca
High-end offices and stock trading floors. Phased construction through three floors of a mid-rise office building. Project included extensive casework, architectural millwork, and finishes. Key issues included life-safety, materials handling and accelerated construction.
Genesis Microchip Corp. (Tenant Improvement) $1,750,000
San Jose, Ca
Build-out of 60,000 SF of shell in 10 weeks. Included new offices, labs, server room, and toilet cores.
Hoya Optics (Heavy Industrial/Structures) $4,500,000
Fremont, Ca
30,000 SF of two-story steel framed industrial building for the manufacture of optical quality glass. Project included 16,000 amps of electrical distribution and a second floor designed to 250 lbs/SF live load.
Hyseq, Inc. (Bio-Medical/GMP) $2,700,000
Sunnyvale, Ca
50,000 SF phased construction of new offices, GMP Manufacturing, labs, and clean rooms. 3,200 SF of new Class 100 H6 Clean Room and pad expansion. Designed and built in 14 weeks.
Inside Source (Retail) $150,000
San Carlos, Ca
Showroom build-out including curved, laminated see-through plastic walls, in-laid carpet designs and varying etched glass panels of varying heights throughout.
JDS Uniphase, Bldg. 7 (Tenant Improvement) $1,100,000
San Jose, Ca
New 22,000 SF of executive office area including boardroom, exercise, mailing, and shower rooms. Completed in 6 weeks.
Keravision (Medical/GMP) $625,000
Fremont, Ca
Office modifications, exit corridors, DI water system, and 4000 SF of GMP Class 10000 production Clean Room.
Micrel Semiconductor (Clean Room/Hazardous Occupancy) $900,000
San Jose, Ca
Construction of an EPI room in an operating fab. Included the tool installation.
Nova Crystals (Clean room/Hazardous Occupancy) $2,500,000
San Jose, Ca
Design-build 5,000 SF of Class 1000 Clean Room. Included CDA, AWN, DI, and power upgrade.
NuGen (Bio-Medical) $450,000
San Carlos, Ca
Office and lab modifications including the installation of new hoods, air-handling equipment, emergency generator and exterior equipment pad.
Oepic (Clean Room/Hazardous Occupancy/Seismic/Structure) $5,600,000
Sunnyvale, Ca
Design-build 10,000 SF of H2/H6 Class 100 Clean Rooms for fabrication of optical switches. Included facilities for and installation of MoCVDs. Included new K bracing and footings and independent steel frame and platform for equipment above the roof.
Oread Pharmaceutical (Pharmaceutical) $500,000
Palo Alto, Ca
Installation of fluid bed dryer in existing pill packaging facility.
Oshman’s Sporting Goods (Retail) $350,000
San Jose, Ca
18,000 SF of retail store build out.
Peninsula Beauty Supply $145,000
San Jose, Ca
New 4,000 SF of salon, offices, and retail sales area.
Photonics (Clean Rooms/Hazardous Occupancy) $495,000
Milpitas, Ca
Design-build 800 SF of Class 10. A total of 11 weeks from design through final inspection.
Roche Biosciences R6 Chemical Building (Structure/Hazardous Occupancy/Pharmaceutical) $695,000
Palo Alto, Ca
New 2,000 SF metal stud framed building with EIFS exterior and concrete block for H2 and H7 use.
Roche Biosciences Mass Spectrometer (Laboratory) $189,000
Palo Alto, Ca
Laboratory remodel and preparation for new equipment fit-up.
Seagate Media (Clean Room/Hazardous Occupancy) $840,000
Fremont, Ca
Upgrade of central plant (CDA, housekeeping and process vacuum). Upgrade existing pipe distribution system in operating clean rooms.
Signature Biosciences (Bio-medical) $750,000
Hayward, Ca
Design-build renovation of existing 35,000 SF of R&D laboratories building to accommodate new office and lab areas.
Silicon Genesis Corporation (Clean Room/Hazardous Occupancy) $1,300,000
San Jose, Ca
Design-build H6 facility, including about 2,000 of Class 10 and 100 clean rooms. New AWN, scrubber, DI, and installation of 15 process tools. Project designed, permitted, and completed in 14 weeks.
Skystream Networks (Tenant Improvement/Structure/Seismic) $4,300,000
Sunnyvale, Ca
New building addition of 14,000 SF, 10,000 SF of new mezzanine, and the seismic renovation of 55,000 SF of building. Complete new building exterior. New Class “A” interiors including extensive curved stepped soffits and vaulted ceilings, a mini-theater, and a two-story curved-glass lobby. Project was completed in 22 weeks.
Stewart and Associates (Structures/Seismic) $3,400,000
Sunnyvale, Ca
Included 45,000 SF seismic upgrade and architectural makeover with major wall openings for new windows. New 2 story 30,000 SF tilt-up with two-story lobby was added.
Sunnyvale Business Park (Tenant Improvement) $675,000
Sunnyvale, Ca
New lobby, toilet cores, and new stairwells added. Open office-build-out of 60,000 SF.
Supertex (Clean Room/Hazardous Occupancy) $1,650,000
San Jose, Ca
Design-build 2,300 SF Class 10 H6 clean room expansion in existing fab. Included installation of nine tools and acid neutralization system.
Taryn Rose (Retail) $178,850
San Jose (Santana Row), Ca
Eleven hundred SF of very high-end retail. Architectural features included curved walls and ceilings, waterfall and limestone flooring.
TDS Architects (Tenant Improvement) $330,000
San Jose, Ca
Complete restoration and interior build-out of a two-story building.
Wave Crest Development (Tenant Improvement) $106,000
Santa Cruz, Ca
Build-out of 3,700 SF including yoga exercise suite, skylights, open areas, landscape and sidewalks.
Whole Earth Access (Retail) $1,200,000
San Jose, Ca
Renovation of 60,000 SF including HVAC, storefronts, canopy’s, exterior columns, stucco finishes, new parking lot, exterior lighting and extensive finish work. Project completed in 10 weeks.
Yahoo! (Tenant Improvement) $600,000
Santa Clara, Ca
Fast Track interior renovation of 55,000 SF of existing office space to open environment with extensive use of color and patterns. Included data center.
|